Civic Center Expansion

Lexington Center Corporation

Project Description: This project involved the expansion and renovation of iconic Rupp Arena, Heritage Hall Convention Center and the Civic Center Shops – all function areas within the Lexington Civic Center. The complete design of the project was broken into 15 individual design releases, each pertaining to a specific sub-project. It also include the construction of a new central utility building to house new chillers and cooling towers for the entire facility. This project required a high level of scheduling and bid package definition during preconstruction and a high level of owner-operation coordination throughout construction.
Firm Role: As construction manager as agent, Congleton-Hacker provided preconstruction services, including master project phasing, critical path scheduling, conceptual estimating, value engineering, bid package definition and special conditions preparation. Our construction phase services included overall responsibility for all aspects of project schedule, bidding, construction, coordination with owner operations and events, and management of master construction budget.
Owner Contact:
Mr. Bill Owen, president and CEO
Lexington Center Corporation
859-233-4567